ROAD TO TERMINAL – RURUKAN BUILT
29.07.2010. Posted by translator. Source: 04/06/2010. Manado post
Tomohon – Complaints of Rurukan residents related to the destruction to the area of agro-tourism road to the village was answered already. Public Works Department (PU) started an action to build road from the Beriman terminal toward Rurukan. As monitored by this newspaper, the road has been covered by Lapis Agegrat Foundations (LPA), as the foundation for the road. Provision of LPA makes the roads in the city border of Tomohon and Rurukan become wider. (Vip)-
bIMS
31.08.2010. tomohon.
tomohon so ta tambah banya jalan mar jangan asal buka jalan di daerah sekitar hutan lindung contohnya di kaki gunung mahawu dan masarang. bila so jadi pemukiman di situ mungkin taon-taon datang orang tomohon susah aer karna pasti pohon-pohon dis…
-
Maksum Panjaitan
31.08.2010. Medan.
saya senang berkunjung ke tomohon, semoga semakin cepat berkembang jadi kota yg indah dan sejuk, i love kota tomohon !!!!!!!!…
-
TINUTUAN OVER THE VILLAGE
02.08.2010. Posted by translator. Source: 03/05/2010. Harian Komentar | news
-
THOUSANDS OF STUDENTS ON THE ROAD, TOMOHON CROWDED
02.08.2010. Posted by translator. Source: 03/05/2010. Harian Komentar | news
-
TOMOHON APPOINTED TO REPRESENT INDONESIA IN MALAYSIA
02.08.2010. Posted by translator. Source: 01/05/2010. Harian Komentar | news
-
The City of Tomohon - City of Flower
15.09.2008. Posted by Bagian Administrasi Elektronik. Source: Flower City News









